---
title: "Ibex House, Stratford"
date: 2026-11-02T12:30:00+00:00
author: Lewis Drury
canonical_url: "https://www.sbscladding.com/projects/ibex-house-stratford"
section: Projects
---
![CJD 1045 HR](/uploads/generic/images/_1440x630_crop_center-center_none/CJD_1045_HR_2026-10-21-131820_rcsh.jpg) 

 

- [ Home ](https://www.sbscladding.com/)
- \|
- [Projects](https://www.sbscladding.com/projects)
- \|
- [ Ibex House, Stratford ](https://www.sbscladding.com/projects/ibex-house-stratford)
 
 

 

 

  Rockpanel 

 

 

Share project

             

 

#  Ibex House, Stratford 

 

 

 

 

**Overview**

Ibex House is a 13-storey mixed-use building in Stratford, East London, comprising 112 residential flats above ground-floor commercial units. Delivered by [Lawtech](https://www.lawtechgroup.co.uk/) for [London &amp; Quadrant Housing Trust](https://lqhomes.com/) (L&amp;Q), the £6.5 million project involved an extensive façade remediation programme to address building safety and compliance requirements.

The works included the removal and replacement of several existing external wall systems, alongside improvements to balconies and associated building components. SBS Cladding supplied 1,000m² of [Rockpanel](https://www.sbscladding.com/mineral-fibre-cladding/rockpanel) cladding for the project, supporting the installation of the building’s replacement rainscreen façade.

 

 

  

**Concept**

The existing building featured a variety of façade materials, including terracotta tiles, aluminium panels, insulated render and spandrel panels. Replacing these systems required a coordinated approach to material specification and installation, with the new façade incorporating Rockpanel FS-Xtra rainscreen cladding alongside a mineral wool insulation system.

The project also presented significant logistical challenges. Situated directly alongside Maryland railway station, the site required early coordination with Network Rail to support safe working near the railway. Space restrictions meant that site welfare facilities and the compound had to be established on the building’s level-five roof terrace.

As the building remained occupied, the team also needed to maintain access to ground-floor commercial premises and manage a revised entrance route for Zikora Nursery. Careful planning was therefore essential to coordinate the works while minimising disruption to residents, businesses and the surrounding area.

 

 

     ![CJD 1035 HR](/uploads/generic/images/_518x512_crop_center-center_none/CJD_1035_HR.jpg)  

   ![CJD 1019 HR](/uploads/generic/images/_518x512_crop_center-center_none/CJD_1019_HR.jpg)  

 

 

  

**Completion**

Delivered over a 25-month programme, the project brought together multiple façade and building improvement works within a complex, occupied environment. Alongside the new rainscreen cladding, the wider scheme included replacement insulation and render systems, new spandrel panels, balcony decking and cavity fire barriers where required.

SBS Cladding’s supply of Rockpanel supported Lawtech’s delivery of the façade package, contributing to the building’s wider remediation objectives.

Resident engagement also played an important role throughout the programme, with regular newsletters and meetings helping to keep occupants informed of progress. The project demonstrates the coordination required to deliver large-scale façade remediation, combining appropriate material specification with careful site management and consideration for building users.

 

 

   [ 

       ![CJD 1046 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1046_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1046_HR.jpg) 

 

 [ 

       ![CJD 1044 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1044_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1044_HR.jpg) 

 

 [ 

       ![CJD 1048 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1048_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1048_HR.jpg) 

 

 [ 

       ![CJD 1022 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1022_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1022_HR.jpg) 

 

 [ 

       ![CJD 1055 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1055_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1055_HR.jpg) 

 

 [ 

       ![CJD 1056 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1056_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1056_HR.jpg) 

 

 [ 

       ![CJD 1050 HR](/uploads/generic/images/_1076x650_crop_center-center_none/CJD_1050_HR.jpg) 

 ](/uploads/generic/images/_1000xAUTO_crop_center-center_none/CJD_1050_HR.jpg) 

 

 

           

 

 

 

  Latest Projects

  Genius 

 

   ![CJD 1620 HR Large](/uploads/generic/images/_406x410_crop_center-center_none/CJD_1620_HR-Large_2026-09-30-115009_mkgo.jpg)  

Eden Grove, Staines-upon-Thames

 

 [ View project  ](https://www.sbscladding.com/projects/eden-grove-staines-upon-thames) 

 

  Rockpanel 

 

   ![DSC08711 Dx O Deep PRIME XD2s topaz sharpen 1](/uploads/generic/images/_406x410_crop_center-center_none/DSC08711-DxO_DeepPRIME-XD2s-topaz-sharpen-1.jpg)  

The Grand Exchange, Bracknell

 

 [ View project  ](https://www.sbscladding.com/projects/the-grand-exchange-bracknell) 

 

   ![CD8 1505 HR](/uploads/generic/images/_406x410_crop_center-center_none/CD8_1505_HR.jpg)  

Lloyds Row, London

 

 [ View project  ](https://www.sbscladding.com/projects/lloyds-row-london)
